SOC 2 Type II
Checks that your controls worked over time.
What it covers
A Type II report covers an observation period, usually several months, and states whether your controls operated effectively throughout it. It is the report most enterprise buyers ask for, because it shows the controls ran, not just that they were written.
What it means for timing
The observation period cannot be shortened by paperwork. Controls must run and leave evidence for the whole period, so start early.
What we do
We set up the controls and the evidence schedule, so the observation period produces a clean record.
What we don't do
We don't issue the report, and we can't promise the auditor's result.
Why the observation period matters
A Type II report tests your controls across a period of time. The period is commonly three to twelve months, and many companies aim for six or more. During that time the controls must run as written, and each run must leave evidence.
This is the part you cannot compress with paperwork. If a control was missing in week four, the auditor will see it.
What the auditor tests
- Samples: the auditor selects a set of events, such as access grants, reviews, and terminations, and checks each one against the control.
- Exceptions: a failed sample is recorded. Some exceptions are acceptable; a pattern of them is not.
- Consistency: the control must work the same way across the whole period, not only at the start.
What you need to keep
- A dated record for every control run, such as a sign-off, export, or ticket.
- A named owner for each control, so the auditor knows who to ask.
- Changes to controls recorded when they happen, with the reason.
Keep these records from the first day of the observation period. Rebuilding them afterwards is slow and rarely complete.
Planning the timing
Many buyers accept a Type I while the Type II period runs, and then ask for the Type II when it is ready. Plan the start date around the deals you expect to close, and check the timing with your CPA firm before you commit.